Manufacturing of prestressed concrete (PSC) bridge slabs and RCC ballast retainer of 3.66m span (1set) and 6.1m span (70 sets) at a suitable location and launching at specified bridgesin Balipara -North Lakhimpur.
E/work in embankment in filling/cutting & rebuilding/ strengthening of all minor bridges up to 3x1.83m span from ch.388.00 km to 450.00 km between stations Silapathar and Murkongselek.
E/work in filling between ch.215.875 km to217.875 km of Brahmajan-Gohpur section including construction of bridge No.153(1x6.1m PSC slab), 154(2x18.3m PSC girder) & 155 (1x6.1m PSC slab)
Rebuilding of major br.No.360(4x45.7m) at km 381/0-383/6 and br.No.370(5x12.2m) at km 394/6-396/1 between Dhemaji -Silapathar and Silapathar -Telem respectively.
E/work in filling between ch.281.800 km to 283.500 km of Tunijan -Kathalpukhari section including construction of bridge no. 269(2x6.1m PSC slab), 270(2x18.2m PSC girder) & 271(2x6.1m PSC slab)
E/work in filling between ch.284.450 km to 285.550 km of Tunijan -Kathalpukhari section including construction of bridge no. 274(2x6.1m PSC slab), 275(2x18.2m PSC girder) & 276(2x6.1m PSC slab)
E/work in cutting soil nailing work for stabilisation of earthwork cutting slope on hill side, constn.of minor br.No.III/107 & other ancillary work betn.ch.119/100 to 119/595 in between New Jatinga Lumpur -New Harangalao station.
Supplying,stacking & spreading of 50mm size machine crushed ballast along the cess and depot from ch.266.00 km to 279.00 km between section Harmati (excluding yard) to Kathalpukuri (including yard) in connection with gauge conversion of Balipara -North Lakhimpur gauge conversion project
Supplying,stacking & spreading of 50mm size machine crushed ballast along the cess and depot from ch.286.00 km to 296.00 km between section Silonibari (excluding yard) to North Lakhimpur (including yard) in connection with gauge conversion of Balipara -North Lakhimpur gauge conversion project