Home  Tender Bill Status  |  Railway Reservation  |  Email  |  Other Railway Sites  |  RTI  |  General Information  |  Organization

   
Welcome, Guest
 

Available Corrigendum

 
 Search Corrigendum Back to tenders
 
  Unit Location  
Department  
  Opening Date       (DD/MM/YYYY)
 

 Please Click on the Tender No. to see more details. You must login to download the tenders.
New Users can
Register here.

 

 Tender No

  Description

 Issue Date  

Opening Date

Corrigendum

CE/CON/ARCL-JRBM(SCL)/MB/2012/.11

Respecting of stringers of Br. No.2 (6 x 61.00m +1 x 18.30m span), assembling and erection of Br.96 (3 x 45.70 M) in ARCL-JRBM section and transportation assembling and erection of Br. No. 28 (3 x 12.2m plate girder) & 37 (3 x 9.27 M plate girder)in BPB –SCL section under running traffic condition including supply of dual gauge steel channel sleeper and transportation of released girder to notified location etc. of ARCL-JRBM section .

15/5/2012

1/6/2012 10:00:00 AM

1) 01
Dated: 16/5/2012
2) 01
Dated: 16/5/2012

CE/CON/ARCL-JRBM(SCL)/MB/2012/.11

Respecting of stringers of Br. No.2 (6 x 61.00m +1 x 18.30m span), assembling and erection of Br.96 (3 x 45.70 M) in ARCL-JRBM section and transportation assembling and erection of Br. No. 28 (3 x 12.2m plate girder) & 37 (3 x 9.27 M plate girder)in BPB –SCL section under running traffic condition including supply of dual gauge steel channel sleeper and transportation of released girder to notified location etc. of ARCL-JRBM section .

15/5/2012

1/6/2012 10:00:00 AM

1) 01
Dated: 16/5/2012
2) 01
Dated: 16/5/2012

CE/CON/NCB-SMTA/EMB/2012/01

Earthwork in formation for Railway embankment and construction of minor bridges & major Br.No. 165 at ch.152/2-3 km along with all other connected ancillary works from New Alipurduar –Samuktala road Jn.from km 144.660 to km 155.210 in connection with the doubling of BG Railway line from New Coochbehar –Samuktala road Jn

15/5/2012

1/6/2012 10:00:00 AM

1) 01
Dated: 17/5/2012

CE/CON/Sick line/ Stn Bldg/13

At New Jalpaiguri Junction – Construction of Sick Line Shed (85mx18m PEB building system) and attached service building (85mx5m) with provision of movement of 2 nos 25 ton capacity EOT crane including stilonite and epoxy flooring, sick line office (65mx7m appx) R. C. C. D. S. building, 2 nos Coaching Pit Line (600m each), Over Head Water Reservoir, Washable apron (150m appx), Track Linking and all other connected ancillary works

15/5/2012

1/6/2012 10:00:00 AM

1) 01
Dated: 10/5/2012

CE/CON/KXJ MSSN/BRGM DLCR /MB/2012/.12

Construction of Super structure of Major Bridge No. 599-A (3 x30.5 M Through Girder) at KM 208/3-4 over Longai River in Karimganj-Mahisashan section & Major Bridge No. 35(1 x 30.5 M Through Girder) at KM 25/5-6 in Baraigram-Durllabhcherra Section on diverted alignment in connection with gauge conversion of Karimganj-Mahisashan & Baraigram-Durllabhcherra

1/5/2012

1/6/2012 10:00:00 AM

1) 01
Dated: 16/5/2012

CE/CON/J-I/RCC Retaining Wall/2012/08

Construction of R.C.C. Retaining wall on deep fouindation to protect high embankment along river at Ch. Km 14.620 to Km 14.900, in connection with the construction of new BG Railway line from Jiribam to Tupul (Imphal) under Dy.CE/CON/JRBM-1 at SCL

1/5/2012

25/5/2012 10:00:00 AM

1) 01
Dated: 8/5/2012

CE/CON/NLP /MZS/SPTR/Ballast/2012/14

Manufacturing and supplying of 50mm size machine crushed stone ballast on cess/berm of Railway embankment and station yards between Km 340 to 387 in between existing stations Gogamukh – Silapathar (including station yard) in connection with Gauge Conversion of North Lakhimpur – Murkongselek section

1/5/2012

25/5/2012 10:00:00 AM

1) 01
Dated: 18/5/2012

CE/CON/J-I/EMB/2012/07

Earthwork in filling to form embankment/sub-bank and construction of Minor Bridge No.29 & 29A between Chainage 12.30 KM to Chainage 12.550 KM between Dholakhal & Kaimai road station in connection with the construction of new BG Railway line from Jiribam to Tupul (Imphal) under Dy.CE/CON/JRBM/I at SCL

23/4/2012

8/6/2012 10:00:00 AM

1) 01
Dated: 4/5/2012
2) 02
Dated: 4/5/2012

CE/CON/ABFC-NMX/EMB/2012/10

Earth work in forming embankment, construction of major/minor bridges and all other connected ancillary works from Km 8.70 to 19.00 in between stations Ambari Falakata to Raninagar Jalpaiguri (including Belakoba yard) Road in connection with BG doubling work of Ambari Falakata – New Maynaguri section of N.F. Railway

23/4/2012

25/5/2012 10:00:00 AM

1) 01
Dated: 3/5/2012
2) 02
Dated: 3/5/2012

CE/CON/ABFC-NMX/EMB/2012/10

Earth work in forming embankment, construction of major/minor bridges and all other connected ancillary works from Km 8.70 to 19.00 in between stations Ambari Falakata to Raninagar Jalpaiguri (including Belakoba yard) Road in connection with BG doubling work of Ambari Falakata – New Maynaguri section of N.F. Railway

23/4/2012

25/5/2012 10:00:00 AM

1) 01
Dated: 3/5/2012
2) 02
Dated: 3/5/2012

CE/CON/ABFC-NMX/EMB/2012/11

Earth work in forming embankment, construction of major/minor bridges and all other connected ancillary works from Km 19.00 to Km 27.00 in between stations Belakoba (excluding Belakoba yard) to Raninagar Jalpaiguri (including Raninagar Jalpaiguri yard) in connection with BG doubling work of Ambari Falakata – New Maynaguri section of N.F. Railway

23/4/2012

25/5/2012 10:00:00 AM

1) 01
Dated: 3/5/2012

CE/CON/FKM-DBB/EMB/2012/12

Construction of sub-structure of major bridge No.5, span (4 x 30.50m) at Km 9.286 in between station SPX – TPK and earthwork for diversion in formation of Railway embankment along with all other connected ancillary works in connection with GC Project from FKM – DBB

23/4/2012

25/5/2012 10:00:00 AM

1) 01
Dated: 3/5/2012

CE/CON/ARR-GAGA/EMB/2012/13

: Construction of new major bridges No.125 at Ch. 87448m & 129 at Ch. 91565m (Span 3 x 12.20m), 131 at Ch. 93278m, 126 at Ch. 87905m & 141 at Ch. 100800 (Span 2 x 12.20m) on pile foundation with PSC slab superstructure. Protection work and other ancillary works between Pawakhali to Thakurganj in connection with Araria – Galgalia new line project of N.F. Railway

23/4/2012

25/5/2012 10:00:00 AM

1) 01
Dated: 3/5/2012

CE/CON/J-I/EMB/2012/07

Earthwork in filling to form embankment/sub-bank and construction of Minor Bridge No.29 & 29A between Chainage 12.30 KM to Chainage 12.550 KM between Dholakhal & Kaimai road station in connection with the construction of new BG Railway line from Jiribam to Tupul (Imphal) under Dy.CE/CON/JRBM/I at SCL

23/4/2012

8/6/2012 10:00:00 AM

1) 01
Dated: 4/5/2012
2) 02
Dated: 4/5/2012

CE/CON/RPAN-NLP/BVU-BVNG/PSC And RCC Slab/2012/1

Construction of PSC/RCC approach slab of 6.1m (PSC) and 4.0m (RCC cast in situ) in the approach of major bridges and construction, carriage and launching of balance 3.66m and 6.1m PSC slab including construction of ballast retainer, inspection steps and other miscellaneous work in between RPAN – NLP section and BVU – BVNG section in connection with GC work.

23/4/2012

25/5/2012 10:00:00 AM

1) 01
Dated: 4/5/2012

Dy CE/CON/APDJ/Carriage-P.Way /NMX-NCB/2011/87(RT)

Carrying of Rails & PSC sleepers from scattered locations at NCB/NJP/NBQ & carrying of the same to New Changrabandha-New Coochbehar section at worksite, alongwith other connected ancillary works in connection with construction of New Changrabandha-New coochbehar New BG Line of N.F.Railway

23/4/2012

24/5/2012 11:00:00 AM

1) 01
Dated: 7/5/2012

CE/CON/K-B (SCL)/Stn.Bldg.RBG /2012/08

: Construction of RBG room station Building & earthwork in filling to form embankment in yard and Platform in station yard at Algapur and Monacherra, Construction of Br. No.22 (1 x 1.83 RCC Box) with all ancillary works in connection KTX – BHRB Gauge Conversion Project

23/4/2012

25/5/2012 10:00:00 AM

1) 01
Dated: 4/5/2012

CE/CON/B-S/(Tunnel No.2 – 5)/2012/05

Construction of Single line BG Tunnel No.2 (App. length 457 RM) from Km 7.180 to Km 7.637, Tunnel No.3 (App. length 118 RM) from Km 13.339 to Km 13.457, Tunnel No.4 (App. length 215 RM) from Km 13.875 to Km 14.090 & Tunnel No.5 (App. length 165 RM) from Km 14.328 to Km 14.493 having total length of 955 RM (approx) and other ancillary works in between station Bhairabi and proposed Hortoki station in connection with Construction of New Railway BG Line from Bhairabi to Sairang (Mizoram) (Two Packet System)

16/4/2012

1/6/2012 10:00:00 AM

1) 01
Dated: 23/4/2012
2) 02
Dated: 23/4/2012

CE/CON/B-S/(Tunnel No.1)/2012/04

Construction of Single line BG Tunnel No.1 (App. length 1733 RM) from Km 2.090 to Km 3.823 in between Bhairabi to Sairang in connection with Construction of New Railway Line Project Bhairabi - Sairang of N.F. Railway (Construction), (Mizoram) (Two Packet System)

16/4/2012

1/6/2012 10:00:00 AM

1) 01
Dated: 23/4/2012
2) 02
Dated: 23/4/2012

CE/CON/B-S/(Tunnel No.1)/2012/04

Construction of Single line BG Tunnel No.1 (App. length 1733 RM) from Km 2.090 to Km 3.823 in between Bhairabi to Sairang in connection with Construction of New Railway Line Project Bhairabi - Sairang of N.F. Railway (Construction), (Mizoram) (Two Packet System)

16/4/2012

1/6/2012 10:00:00 AM

1) 01
Dated: 23/4/2012
2) 02
Dated: 23/4/2012

       

First : Previous [  1 2 3 4 ] Next : Last  

 

History  |  Telephone Directory  |  Email Directory  |  System Map  |  Disclaimer  |  News  |  Contact Us  |  Feedback

Powered by WebX